Back to News
company2026-07-144 minFaran Project Team

Germany Project: UHB200 High-Voltage Storage System

A compact high-voltage battery installation prepared for a European residential and light-commercial energy project.

Germany Project: UHB200 High-Voltage Storage System
Project brief

The photographed UHB200 system demonstrates how a modular high-voltage battery can be arranged within a compact equipment area for a European project. The delivered configuration was prepared around the selected inverter voltage window, communication protocol and usable-energy requirement. Before commissioning, the installer should confirm CAN or RS485 wiring, battery addressing, grounding, protection settings and the applicable local electrical documentation.

Engineering focus

  • Modular high-voltage battery architecture
  • Inverter communication prepared before commissioning
  • Project documentation matched to the destination market