All-in-One 10 kWh ESS
Battery + Inverter + EMS, plug & play

CE
UN38.3
IEC62619
TÜV
All-in-One System
Overview
10 kWh LiFePO4 + 5 kW hybrid inverter + EMS, all in one unit. Plug-and-play residential storage, no wiring required. Floor-standing design.
Key Features
- 10 kWh battery + 5 kW inverter
- Plug-and-play, no wiring
- Mobile app monitoring
- Off-grid / on-grid / hybrid
- Floor-standing, IP65
MOQ
5 units
Lead Time
40 days
Warranty
10 years
Certification
CEUN38.3IEC62619TÜVIEC62109
Specifications
Detailed technical parameters of All-in-One 10 kWh ESS.
| Battery | 10.24 kWh LiFePO4 |
| Inverter | 5 kW hybrid |
| Max PV Input | 7.5 kW |
| Output | 230V single phase |
| Backup | <10ms UPS |
| Weight | 135 kg |
| Dimensions | 600 × 600 × 1200 mm |
Applications
Typical use cases and deployment scenarios.
01
Residential ESS02
Solar + storage03
Home backup04
Smart home integrationPackaging & Delivery
Standard export packaging suitable for sea, air, and land transport.
Standard Packaging
Wooden case + foam + EPE, anti-static bag, edge protectors.
Container Loading
20GP / 40GP / 40HQ available, custom loading plans provided.
Lead Time
40 days for bulk orders. Sample orders: 7 days.
FAQ
Frequently asked questions about All-in-One 10 kWh ESS.
Can you provide OEM/ODM service?+
Yes. We support full OEM/ODM including custom logo, capacity, voltage, BMS parameters, enclosure color, and packaging. Our engineering team can design tailored solutions based on your requirements.
What is your MOQ?+
MOQ for this product is 5 units. Sample orders are welcome with a slightly higher unit price.
What is the warranty period?+
Standard warranty is 10 years. Extended warranty up to 10 years is available for commercial and industrial projects.
How do you ship the products and what is the lead time?+
We ship via sea freight (FCL/LCL), air freight, or express (DHL/FedEx). Lead time is 40 days for bulk orders. We can also arrange CIF, FOB, or DDP terms.
Are the products certified for international markets?+
Yes. This product carries: CE, UN38.3, IEC62619, TÜV, IEC62109. Additional certifications (UL, TÜV, etc.) can be arranged on request.
